Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Required Skills

Required skills

Required skills include

identifying steps and processes in current operations

identifying current performance against key performance indicators KPIs

determining where performance especially suboptimal performance relates to unique factors or is a manifestation of other symptomscircumstances

manipulating data to determine capacity buffers delivery schedule throughput and other required information

communicating with relevant people and asking leading questions

applying resources to maximise output of capacity constrained resource drumbufferrope approach

Required knowledge

Required knowledge includes

theory of constraints including

concepts of weakest link often colloquially known as the drum

duration in production applications this is often known as material release buffer or inventory to protect the weakest linkconstraint

release timing of buffer colloquially called rope

organisation processes products and internal and external customers

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to

identify capacity constrained resource

manage capacity constrained resource drum

determine schedule based on capacity constrained resource

Context of and specific resources for assessment

Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices

Access may be required to

workplace procedures and plans relevant to work area

specifications and documentation relating to planned currently being implemented or implemented changes to work processes and procedures relevant to the assessee

documentation and information in relation to production waste overheads and hazard controlmanagement

reports from supervisorsmanagers

case studies and scenarios to assess responses to contingencies

minutes of meetings and other records relevant to determining and dealing with the core conflict

Method of assessment

A holistic approach should be taken to the assessment

Competence in this unit may be assessed by using a combination of the following to generate evidence

demonstration in the workplace

workplace projects

suitable simulation

case studiesscenarios particularly for assessment of contingencies improvement scenarios and so on

targeted questioning

reports from supervisors peers and colleagues thirdparty reports

portfolio of evidence

In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge

Where applicable reasonable adjustment must be made to work environments and training situations to accommodate ethnicity age gender demographics and disability

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the oracy language and literacy capacity of the candidate and the work being performed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Competitive systems and practices

Competitive systems and practices may include, but are not limited to:

lean operations

agile operations

preventative and predictive maintenance approaches

monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP), and proprietary systems

statistical process control systems, including six sigma and three sigma

Just in Time (JIT), kanban and other pull-related operations control systems

supply, value, and demand chain monitoring and analysis

5S

continuous improvement (kaizen)

breakthrough improvement (kaizen blitz)

cause/effect diagrams

overall equipment effectiveness (OEE)

takt time

process mapping

problem solving

run charts

standard procedures

current reality tree

Competitive systems and practices should be interpreted so as to take into account:

the stage of implementation of competitive systems and practices

the size of the enterprise

the work organisation, culture, regulatory environment and the industry sector

Constraint/capacity constrained resource

A capacity constrained resource refers to:

the step in a process or part of a system which limits the output of the entire system or process (colloquially known as a bottleneck)

Drum

The capacity constrained resource is often referred to as the drum, as its output provides the ‘drumbeat’ for the output of the entire system or process

Buffer

Buffer refers to:

the slack time required in the system to protect the capacity constrained resource (drum) against disruption (in a physical process this is usually represented by work in progress)

Optimum use of capacity

Optimum use of capacity refers to:

ensuring the capacity constrained resource is not diverted or prevented from producing at its limit

Supply schedule (‘rope’)

Supply schedule refers to:

ensuring the capacity constrained resource has what it needs when it needs it (often referred to as ‘the rope’ – the system which releases supply as needed)

Delivery schedule

Delivery schedule refers to:

what the system/process is actually able to deliver from the capacity constrained resource once it has been appropriately buffered and supplied

Appropriate action

Appropriate action may include:

advising customers and stakeholders of the actual production capacity