Elements and Performance Criteria
- Identify the system constraint and throughput
- Identify goals and objectives of the organisation
- Identify systems, processes and products to be examined
- Determine throughput of steps within the system
- Identify the capacity constrained process
- Determine optimum throughput of capacity constrained process (drum)
- Determine maximum system throughput based on the capacity constrained process