Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Facilitate the pull system
  2. Level the flow of work
  3. Allocate resources to balance work flow
  4. Evaluate improvements
  5. Embed improvements

Range Statement

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Competitive systems and practices include one or more of:

lean operations

agile operations

preventative and predictive maintenance approaches

statistical process control systems, including six sigma and three sigma

Just in Time (JIT), kanban and other pull-related operations control systems

supply, value, and demand chain monitoring and analysis

5S

continuous improvement (kaizen)

breakthrough improvement (kaizen blitz)

cause/effect diagrams

overall equipment effectiveness (OEE)

takt time

process mapping

problem solving

run charts

standard procedures

current reality tree.

Pull system signals include one or more of:

visual cues or signs

kanban cards/tickets

computer alerts or computer-based workflows.

Identified demand is based on one or more of:

identifying a process and its internal and external customers

gathering data on rate and amount of demand.

Variations and barriers include one or more of :

unnecessary movement of work due to physical layout of office

incorrect or incomplete procedures

lack of training or cross-skilling

inadequate or inappropriate equipment

slow or inappropriate communication systems

levels of authority and delegation

incomplete information required to complete task

interruptions

complex and/or unusual situations

bottlenecks

peaks and troughs in demand.

Routines and/or systems to level the flow include one or more of:

Heijunka boxes

types and location of signals

triggers, such as minimum and maximum queue limits and items that are replaced at particular dates

sequencing (e.g. first in first out (FIFO) and due dates)

safety resources

buffer resources

back-up systems, such as maintaining critical hard copy documentation

visual tracking displays.

Optimal flow of work supported by activities including one or more of:

calculating takt time and pitch or similar

levelling the flow

allocating resources

allocating and scheduling work

cross-skilling.