Elements and Performance Criteria
- Plan the installation of hydrometric instruments and equipment
- Analyse the purpose and suitability of hydrometric instruments and equipment required for the site and its conditions.
- Ensure that the manufacturers' specifications are applied.
- Confirm organisational procedures for installing the instruments and equipment and reflect these in the plan of installation task schedules.
- Prepare relevant equipment, logistical requirements, authorisations and documentation required for the installation.
- Install hydrometric instruments, equipment and systems
- Assemble, prepare and test assignmentinstruments and equipment prior to transportation to the site to ensure that they are fit for purpose.
- Install assignment instruments and equipment in accordance with manufacturers' specifications, organisational standards and safe work practices.
- Conduct installation tests in accordance with standard operating procedures to ensure the correct operation of instruments and equipment.
- Complete records and commissioning of the installation process in accordance with organisational procedures.
- Test and maintain hydrometric instruments, equipment and systems
- Test assignment instruments and equipment in accordance with organisational, industry standards and client requirements.
- Make and test adjustments to comply with the required tolerances.
- Report errors or deviations from the appropriate range or tolerance levels in accordance with organisational and industry standards.
- Maintain test records in accordance with organisational requirements.
- Complete routine maintenance in accordance with organisational requirements and maintenance schedules.
- Store and protect instruments and equipment in accordance with organisational and manufacturers' requirements.
- Operate hydrometric monitoring equipment
- Report processes and outcomes