Elements and Performance Criteria
- Define design requirements
- Identify interfaces between pipeline networks and bulk water supply, transfer mains and pumping stations from the concept proposal.
- Identify constraints and design problems within the concept proposal.
- Seek clarification of design requirements as needed.
- Negotiate with stakeholders to resolve design problems.
- Confirm compliance with design standards and specifications relevant to the water reticulation system.
- Document detailed design requirements.
- Identify and apply initial data to the design.
- Prepare design
- Design detailed layout of water mains using project design requirements and design standards and specifications.
- Plan location and installation requirements of stop valves, hydrants, scours, and air valves.
- Design pipeline alignment and connection details.
- Prepare structural and hydraulic design of pipelines.
- Review design
- Prepare and maintain documentation