Elements and Performance Criteria
- Develop servicing strategy
- Determine existing sewerage system load requirements and calculate future loads in accordance with organisational strategic and business plans and contracts.
- Identify planning authority requirements and determine and assess the environmental impacts of the project.
- Analyse constraints that may be applied to meet load requirements.
- Conduct catchment analysis to determine holistic servicing requirements.
- Plan and prepare concept proposal
- Prepare preferred options as the Concept Plan incorporating the outcomes of an analysis of the catchment and the options for servicing future development.
- Establish criteria to control risks.
- Consider operations and maintenance requirements.
- Determine lifecycle costs.
- Review parameters of the planning process using initial data and using approved empirical or modelling systems.
- Prepare and manage supporting documents
- Evaluate planning methods and outcomes