Elements and Performance Criteria

  1. Plan and prepare construction and installation of collection pipelines
  2. Construct and install collection pipelines according to specifications
  3. Review construction and installation of collection assets
  4. Plan and prepare construction and installation of collection pipelines
  5. Construct and install collection pipelines according to specifications
  6. Review construction and installation of collection assets

Performance Evidence

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

installing components specified for wastewater collection system, including requirements for protection

constructing appropriate assets

installing junctions and side lines

planning work and preparing work site safely

constructing and installing pipes according to specifications and instructions

checking quality of work

clearing work site

completing documentation


Knowledge Evidence

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

risk factors and potential hazards of construction and installation processes

equipment operation, capacity and limitations

safe use of lasers

use of automatic levels

basic levelling techniques

profiles and boning rods

pipe laying techniques

effects of weather and conditions on operation of site or plant

environmental aspects of construction and installation

component parts

shoring

construction and installation procedures and materials

Cathodic Protection, Denso wrap, Stopaq