Elements and Performance Criteria
- Plan and prepare for testing and commissioning
- Conduct pipeline and access structure testing procedures
- Select and install tensioning and measuring equipment.
- Select and fit gauges of the correct range to test equipment.
- Carry out testing procedures.
- Locate failed pipes, joints and fittings and reschedule reporting and testing.
- Locate and report failed maintenance holes, inspection shafts, maintenance shafts or other access structures and reschedule further testing.
- Commission the wastewater collection system.
- Record and report results
- Plan and prepare for testing and commissioning
- Conduct pipeline and access structure testing procedures
- Select and install tensioning and measuring equipment.
- Select and fit gauges of the correct range to test equipment.
- Carry out testing procedures.
- Locate failed pipes, joints and fittings and reschedule reporting and testing.
- Locate and report failed maintenance holes, inspection shafts, maintenance shafts or other access structures and reschedule further testing.
- Commission the wastewater collection system.
- Record and report results