Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Performance Evidence
installing stop logs, bulk heads and winch operations identifying and investigating operational problemsregulating flows through the weiroperating the lock gatesoperating lock levelscalculating inflows and discharge ratesundertaking maintenance including at least one of:removing debrisoiling hydraulicsrepairing concretepainting metal workgreasing bearings