Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Performance Evidence
performing system calculationsmonitoring test results and processesidentifying and reporting faultsconducting routine plant inspectionstaking samples and performing basic tests including at least one of:solids analysisjar testingsludge densitycentrate claritydewatering process efficiencypreparing and applying chemical dosingmaking basic process adjustments according to instructions, including at least one of:loading rateschemical dosing ratesdewatering polymerscentrifuge settingscollecting data and completing required documentation
Knowledge Evidence
process layoutfeatures and components of thickening and dewatering systemstheory of process operationchemicals used for sludge conditioning including synthetic and organic polymerschemical dosing processesrisk factors and potential hazards relating to thickening and dewatering systemsrisk control requirements including safety equipment and safety data sheetsequipment operation, capacity and limitationshazardous materials handlingenvironmental aspects of water and/or wastewater treatmentinterpretation and use of safety data sheetsprinciples that form the basis of dewatering processes