Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Required Skills
Evidence Required
Range Statement
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.ContextThis competency applies to the production/building of rubber rollers in the rubber industry. It includes the operation of all relevant additional equipment where that equipment is integral to the roller building process.ProceduresAll operations are performed in accordance with procedures.Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards. Tools and equipmentThis competency includes use of equipment and tools such as:hand carts and trolleysknives and other sheet cutting equipmenthoists/lifting equipment not requiring any special permits or licences solvent application/wiping gearhand tools used in the roller building process relevant personal protective equipment.HazardsTypical hazards include:solvent vapours hazardous materials manual handling hazards knife hazards. Problems'Anticipate and solve problems' means resolve a wide range of routine and non-routine problems, using product and process knowledge to develop solutions to problems which do not have a known solution/a solution recorded in the procedures.Typical process and product problems may include:variations in materials or wrong materialscontamination of materials contamination of core/spindleporous, damaged or unsuitable core/spindle processing problems, including incorrect building.VariablesKey variables to be monitored include:operating temperatures speedcolourcushion specification cycle timeoutput rateproduct integrity and general conformance to specification/sample.