Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Range Statement
This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. |
Regulatory framework | The latest version of all legislation, regulations, industry codes of practice and Australian/international standards, or the version specified by the local regulatory authority, must be used.Applicable legislation, regulations, standards and codes of practice include:health, safety and environmental (HSE) legislation, regulations and codes of practice relevant to the workplace, manual handling and hazardous materials Australian/international standards relevant to the materials being used and products being made, including one or more of:AS/NZS 2642.2:2008 Polybutylene (PB) plumbing pipe systems - Polybutylene (PB) pipe for hot and cold water applications or its replacementAS/NZS 2642.3:2008 Polybutylene (PB) plumbing pipe systems - Mechanical jointing fittings for use with polybutylene (PB) pipes for hot and cold water applications or its replacementAS/NZS 2492:2007 Cross-linked polyethylene (PE-X) pipes for pressure applications or its replacementAS 4176.1-2010 Multilayer pipes for pressure applications - Multilayer piping systems for hot and cold water plumbing applications – General other relevant parts of AS 4176 and their replacementsany relevant licence and certification requirements.All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through state/territory or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and such requirements the legislative requirements take precedence. |
Joining methods | Joining methods include one or more of:mechanicalchemical bondthermal fusion. |
Installation | Installation can be one or more of:above groundbelow ground. |
Procedures | All operations must be performed in accordance with relevant procedures.Procedures are written, verbal, visual, computer-based or in some other form, and include one or any combination of:emergency procedureswork instructionsstandard operating procedures (SOPs)safe work method statements (SWMS)formulas/recipesbatch sheetstemporary instructionsany similar instructions provided for the smooth running of the plant. |
Problems | Problems include one or more of:limitations on the available PE materials, pipes and components variable field site conditionslimitations in available data on specific job requirementsemergency situations. |
Performance Evidence
Knowledge Evidence