Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare the equipment for production
  2. Operate equipment and check on support equipment
  3. Monitor and record operation
  4. Rectify routine problems
  5. Shut down equipment
  6. Prepare equipment for maintenance
  7. Control hazards

Required Skills

Required skills

Required skills include

recognising variances in the process conditions and the equipment which will lead to out of specification production

implementing the enterprises standard procedures and work instructions and relevant regulatory requirements within appropriate time constraints and in a manner relevant to the operation of the equipment

reading and numeracy to interpret workplace documents and technical information

Required knowledge

Required knowledge includes

isolation procedures

chemistry and physics of cementlimeplaster making processes as appropriate

operational processes and functions including startup and shutdown processes

composition and nature of raw materials and finished product

construction and limitations of the equipment

out of specification situations

distinguish between

raw materials

equipment

types of defectsfaults

electricalinstrumental causes of malfunctions

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency

Critical aspects for assessment and evidence required to demonstrate competency in this unit

It is essential that the equipment and the process be understood and that the importance of critical settings and readings is known Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action

Consistent performance should be demonstrated In particular look to see that

startup and shutdown occurs first time

signals and alarms are responded to immediately

all OHS requirements are followed

Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency

Context of and specific resources for assessment

Assessment will require access to an operating plant over an extended period of time or a suitable method of gathering evidence of operating ability over a range of situations

Assessment will occur over a range of situations which will include disruptions to normal smooth operation

Simulation or case studiesscenarios may be required to allow for timely assessment of parts of this unit of competency Simulation should be based on the actual plant and will include walkthroughs of the relevant competency components A bank of scenarioscase studieswhat ifs and questions will be required to probe the reasoning behind observable actions

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units

Individual enterprises may choose to add prerequisites and corequisites relevant to their processes

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Procedures

All operations are performed in accordance with standard procedures and work instructions

Equipment and unit operations

This unit includes all such items of equipment and unit operations which form part of the kiln system. These may include:

instrument panels (local)

measuring and recording equipment

communication equipment

hand tools

emergency stop buttons and lanyards

safety clothing and equipment

Typical problems

Typical problems may include:

equipment malfunctions

temperature fluctuations

quality of product

material/feed variations

spillages and leakages

Occupational health and safety (OHS)

All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence