Elements and Performance Criteria
- Prepare for glazing equipment setup
- Identify all safety and emergency procedures
- Shut down equipment to procedures and manufacturer's specifications
- Isolate equipment in accordance with procedures
- Remove ancillary equipment to procedures and manufacturer's specifications
- Complete records and logs for setup of equipment or changing of parts
- Prepare the process for production
- Consult the production schedule to determine the product to be manufactured
- Ensure availability of raw materials as required
- Identify and provide equipment/change parts, ancillaries and fixtures in accordance with production schedule
- Perform equipment preparation to procedures
- Monitor equipment condition and take corrective action if equipment is in an unsafe condition
- Set up process
- Tune the process
- Monitor operation and compare with procedures for appropriate operation
- Identify any deviation from standard performance
- Identify the cause of the deviation and take action
- Make adjustments to the equipment settings, process conditions or raw materials to bring production into specification
- Continue monitoring operation and making adjustments until product/equipment is within specification
- Respond to problems
- Control hazards