Elements and Performance Criteria
- Confirm design specification
- Design installation process
- Determine method of installing refractory
- Determine refractory materials to be installed
- Determine mix requirements for materials
- Determine installation equipment requirements
- Determine anchor requirements
- Determine post placement requirements
- Design formwork if required
- Design scaffolding or other internal access needs if required
- Design external access/egress means if required
- Identify installation health, safety and environment (HSE) hazards
- Determine appropriate hazard controls
- Check for discrepancies or conflicts in the designs and take appropriate action
- Prepare for installation
- Specify installation procedure
- Liaise with relevant stakeholders
- Modify specification if needed
- Ensure correct ordering of requirements
- Identify time critical items for the installation
- Identify other items critical to the success of the project
- Identify or develop measures to monitor all critical items
- Prepare installation specification
- Monitor installation