Elements and Performance Criteria
- Charge concrete to agitator.
- Deliver concrete.
- Conform to site protocols.
- Check access to site with customer
- Assess site conditions and then drive off road in a manner suited to the conditions, load and site requirements
- Mix concrete on site as per quality requirements
- Discharge concrete as required by customer
- Clean agitator on site after negotiating this with customer
- Complete all records including addition of water.
- Rectify routine problems.
- Identify the range of faults that can occur during the operation
- Determine and rectify fault causes in accordance with procedures/work instructions
- Identify and rectify equipment failure causes in accordance with procedures
- Make sure appropriate records and log books of equipment operations are maintained to meet procedures
- Identify non-routine problems and report to designated person.
- Control hazards.