Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare search plan
  2. Apply datum search planning principles
  3. Apply rescue-planning principles
  4. Evaluate operational direction

Required Skills

This describes the essential skills and knowledge and their level required for this unit

Required Skills

The ability to

a knowledge of coaching and team building concepts

collect and analyse information

develop a compromised search area to suit available assets

effectively communicate and consult with a range of individuals by a range of means including fax

identify potential search patterns and their use pertaining to terrain

plan for results

telephone and facetoface

use initiative to achieve goals

Required Knowledge

Evidence of

a knowledge of potential rescue platforms capabilities and limitations

an understanding of coronial requirements in relation to SAR

an understanding of hypothermiahyperthermia factors

an understanding of Risk Management principles

an understanding of the Personal Development Plan

Evidence Required

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Knowledge of defining the search area

preparing search and rescue plans and making recommendations to the Senior Search and Rescue Officer that are based on research

Consistency in performance

Evidence should be gathered over a period of time in a range of actual or simulated workplace environments

Context of and specific resources for assessment

Context of assessment

Competence must be demonstrable for the relevant work situation by day or night The assessment for this unit is most effectively undertaken on the job but may be undertaken in a simulation eg Search and Rescue Exercise SAREX

Specific resources for assessment

On job assessment will not entail additional resources however rosters may need to be amended in order for simulation eg Search and Rescue exercise SAREX to be effected

Guidance information for assessment

Information that will assist or guide assessment will be written during Phase II of the Review of the PUA Public Safety Training Package

Information that will assist or guide assessment will be written during Phase II of the Review of the PUA00 Public Safety Training Package.


Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Databases may include

contact names

telephone numbers

addresses (where appropriate)

aircraft/vessel details

aircraft/vessel requirements

Databases are maintained by updating details on a regular basis as determined by local policies and procedures

Assets may include

aircraft

including helicopters

Australian Defence Force aircraft

vessels and personnel

police equipment and personnel

civilian vessels

volunteer groups

clubs and associations

Strategic objectives may include

the systematic planning for the provision of Search and Rescue services and includes identification of emerging issues

Tactical objectives may include

the management of specific operations and includes resourcing

coordinating

reporting

etc

Policies and procedures protocols may include

National Search and Rescue manual

international search and rescue manuals and reference texts

legislation relevant to the operation/incident/response

legislation relevant to the organisation

operational

corporate and strategic plans

operational Standing Operating Procedures

operational performance standards

organisational personnel practices and guidelines

organisational quality standards

Last known/most probable position may include

gathering intelligence to establish:

route taken

last verbal/radio or other contact

known patterns based on historical/routine data

navigation plan

Physiological constraints may include

hypothermia

hyperthermia

physical condition

age

sex

mental condition

health

Environmental factors may include

terrain

weather conditions

Technical manuals documentation or relevant publication may include

Search and Rescue manuals

medical charts

flight plans

sail plans

Information management strategies may include

communication flow

use of technology

compatibility

audit trails

standardised information reporting procedures and formats

Calculations may include

using manual or computer systems

utilising compasses

protractors

time/distance/speed calculators

rulers and formulae

Calculations include sweep width and track spacing calculations for persons

vessels and aircraft

calculations in area - time - velocity - spacing

probability of detection factors

time/distance/speed calculations

time frame for survival and mobility calculations

Calculating a search area may include

the intended track/splash point/last known position and time

vectorial factors

wind

current

drift

leeway and other weather factors

positional error and safety factors

Determining a search pattern and track spacing may include

taking into account environmental factors including: weather conditions

currents

terrain

target type including:

person

type of vessel/life raft; and physiological factors including body mass

clothing

medical conditions and state of mind

Determining the nature of the problem may include

consideration of such factors as:

size of area

time of day

number of lives at risk

location/accessibility

condition of survivors

capacity of available resources and speed of rescue platform(s)

Surviving delivery points may include

consideration of safe areas to alight survivor

hospital facilities

medical facilities

Time factors may include

time frame for survival

speed of rescue platform

time of mobilisation

transit times

rescue platform endurance

Continual evidence may include

reviewing available data

monitoring changing weather conditions

monitoring assets capabilities

reassessing requirements

assessing available daylight for search