Elements and Performance Criteria
- Determine scope of inspection
- Methodology for conducting inspection is determined
- Identify fire safety systems on documentation and locate in building
- Fire safety systems are located in building and any variations between plans and actual locations are recorded
- Verify fire safety systems on building plan and associated documentation
- Variations between the building plans and associated documentation and actual locations are recorded
- Review compliance of building'sfire safety systems
- Building's emergency organisational structure is checked against design requirements and relevant industry standards
- Variations to design requirements and relevant standards are noted and reported
- Inspect operation and maintenance of fire safety systems
- Maintenance records are located and examined
- Maintenance procedures and log books are checked against design requirements and relevant standards
- Fire safety systems are tested in conjunction with a building representative and results are recorded and reported, in accordance with organisational procedures and owner or occupier requirements
- Report onoperation and maintenance of fire safety systems
- Information on review of the building’s fire safety systems' compliance is provided to relevant personnel
- Reports are distributed, in accordance with organisational procedures, legislation and/or owner or occupier requirements