Elements and Performance Criteria
- Plan and prepare to strip pile heads
- Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant
- Obtain, interpret and clarify/confirm work instructions before commencing
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage requirements
- Select and check for faults, plant, tools and equipment to carry out tasks
- Identify, address and report environmental issues, potential hazards and risks
- Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
- Strip pile heads
- Check work platform and false work in preparation for pile head stripping
- Determine and mark specified height of pile cut-off
- Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
- Attach pile excess to a crane with a sling
- Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
- Cut steel reinforcing to specified length, and bend to project drawings and specifications
- Clean up
- Plan and prepare to strip pile heads
- Access, interpret and apply strip pile heads documentation and ensure the work activity is compliant
- Obtain, interpret and clarify/confirm work instructions before commencing
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage requirements
- Select and check for faults, plant, tools and equipment to carry out tasks
- Identify, address and report environmental issues, potential hazards and risks
- Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
- Strip pile heads
- Check work platform and false work in preparation for pile head stripping
- Determine and mark specified height of pile cut-off
- Cut horizontal groove to the specified depth at the marked height around the pile to avoid spalling
- Attach pile excess to a crane with a sling
- Strip back concrete above the groove from steel bars/stands without damage to the reinforcing
- Cut steel reinforcing to specified length, and bend to project drawings and specifications
- Clear work area and dispose of or recycle materials
- Clean, check, maintain and store plant, tools and equipment