Elements and Performance Criteria
- Plan and prepare to install pre-cast girders
- Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant
- Obtain, interpret, clarify and confirm work instructions before proceeding
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage
- Select and check for faults plant, tools and equipment to carry out tasks
- Identify, address and report environmental issues, potential hazards and risks
- Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
- Install bearings
- Install girders
- Determine individual girder location
- Determine fitting sequence to install girders and advise the crane operator
- Check girders for conformity to design prior to lifting
- Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position
- Place timber packing to support girder load
- Use drift to align holes and insert and tension locating bolts
- Adjust bearings to provide support across the full face of the bearing to the girder
- Brace girder to prevent lateral movement or rolling
- Remove, roll and store tag lines
- Remove excess epoxy putty or mortar
- Remove timber packing at specified time
- Clean up
- Plan and prepare to install pre-cast girders
- Access, interpret and apply pre-cast girder installation documentation and ensure the work activity is compliant
- Obtain, interpret, clarify and confirm work instructions before proceeding
- Confirm and apply environmental protection and safety requirements
- Obtain, interpret and implement traffic management signage
- Select and check for faults plant, tools and equipment to carry out tasks
- Identify, address and report environmental issues, potential hazards and risks
- Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
- Install bearings
- Install girders
- Determine individual girder location
- Determine fitting sequence to install girders and advise the crane operator
- Check girders for conformity to design prior to lifting
- Check lifting points on girders for serviceability and attach and use tag lines to guide girder to position
- Place timber packing to support girder load
- Use drift to align holes and insert and tension locating bolts
- Adjust bearings to provide support across the full face of the bearing to the girder
- Brace girder to prevent lateral movement or rolling
- Remove, roll and store tag lines
- Remove excess epoxy putty or mortar
- Remove timber packing at specified time
- Clear work area and dispose of or recycle materials
- Clean, check, maintain and store plant, tools and equipment