Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare
  2. Prepare for spraying operations
  3. Spray tack coat
  4. Operate hand lance
  5. Operator maintenance and clean up

Required Skills

Required skills

Specific skills are required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes the ability to carry out the following as required to conduct tack coat spraying operations

apply legislative organisation and site requirements and procedures for conducting tack coat spraying operations

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes knowledge of the following as required to conduct tack coat spraying operations

site and equipment safety requirements

equipment types characteristics technical capabilities and limitations

operational and maintenance procedures

bituminous surfacing operations

site isolation and traffic control responsibilities and authorities

bituminous products

tack coat spraying techniques

processes for the calculation of material requirements application rates and travel speed

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

JSAssafe work method statements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria required skills and knowledge and the range statement of this unit and include evidence of the following

knowledge of the requirements procedures and instructions for conducting tack coat spraying operations

implementation of requirements procedures and techniques for the safe effective and efficient completion of tack coat spraying operations

working with others to undertake and complete tack coat spraying operations that meets all of the required outcomes

consistent timely completion of tack coat spraying operations that safely effectively and efficiently meets the required outcomes

a minimum of m of an existing pavement to be tack coated prior to asphalting using the spray bar completed in a minimum of two separate runs

a minimum of two areas of at least m to be tack coated using a hand lance

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment Where personal safety or environmental damage are limiting factors assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment Selection and use of resources for particular worksites may differ due to the site circumstances

The assessment environment should not disadvantage the participant For example language literacy and numeracy demands of assessment should not be greater than those required on the job

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity

Aboriginal people and other people from a non English speaking background may have second language issues

Where applicable physical resources should include equipment modified for people with disabilities Access must be provided to appropriate learning andor assessment support when required

Method of assessment

This unit may be assessed in a holistic way with other units of competency The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods

written andor oral assessment of the candidates required knowledge

observed documented andor first hand testimonial evidence of the candidates

implementation of appropriate requirement procedures and techniques for the safe effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidates

working with others to undertake and complete tack coat spraying operations

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevantcompliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with State or Territory legislation and regulations, organisational safety policies and procedures, and project safety plan including: protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Site locations may include:

car parks

airport runways

container yards

hard stands

footpaths

bikeways

roadways

Traffic conditions may include:

congested urban environments

low traffic rural areas

off-road un-trafficked areas

buildings

parking sites

pedestrian areas

Tools and equipment may include:

trucks

tanks

spraying equipment

hand lances

transfer hoses

brooms

jets

shovels

compressors

storage tanks

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust and clean-up management

Materials may include:

bitumen emulsions (cationic and anionic)

cutback bitumen

cutters

distillates

water

Application rate are:

to be followed within specified tolerances

Tack coating refers to:

an application in preparation for further surface coatings which are to include but not be limited to asphalt, geo-textile and slurry

Types of surface may include:

spray seal

asphalt

concrete

granular pavement

pavement which is limited to a clean dry surface which may be coated day or night

Tack coat sprayer may be:

a mechanical bitumen sprayer or a truck/trailer mounted bitumen emulsion sprayer used to apply tack coat at a specified rate on a pavement surface

they also provide facilities for hand spraying