Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to conduct tack coat spraying operations
  2. Prepare for spraying operations
  3. Spray tack coat
  4. Operate hand lance
  5. Carry out operator maintenance and housekeeping
  6. Plan and prepare to conduct tack coat spraying operations
  7. Prepare for spraying operations
  8. Spray tack coat
  9. Operate hand lance
  10. Carry out operator maintenance and housekeeping

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of tack coat spraying operations including:

selecting, using and maintaining required tools, plant and equipment

spraying of tack coat including, selecting, controlling and monitoring spraying technique in response to conditions and surface type

operating a hand lance

works effectively with others to undertake and complete tack coat spraying operations that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of conducting tack coat spraying operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, reporting and recording hazards and risks

tack coating a minimum of 500m2 of an existing pavement prior to asphalting using the spray bar, completed in a minimum of two separate runs

a minimum of two (2) areas of at least 20m2 to be tack coated using a hand lance


Knowledge Evidence

The candidate must demonstrate knowledge of conducting tack coat spraying operations through:

applying legislative, organisation and site requirements and procedures for:

site and equipment safety requirements

bituminous surfacing operations

bituminous products

tack coat spraying techniques

project quality requirements

housekeeping

equipment types, characteristics, technical capabilities and limitations

operational and maintenance procedures

site isolation and traffic control responsibilities and authorities

processes for the calculation of material requirements, application rates and travel speed

safety data sheets and materials handling methods

JSAs/JSEA/safe work method statements