Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable legislation, documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of pavement sweeping operations including:selecting and using the required tools and equipmentchecking and maintaining broomapplying correct sweeping patterns and methodsminimising environmental damageworks effectively with others to undertake and complete pavement sweeping operations that meets all of the required outcomes including:organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and systems such as signage to advise others of work activity and exclusion zonedemonstrates completion of conducting pavement sweeping operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:identifying recording and reporting hazards and risksconducting sweeping operations appropriates for conditions including:wind directionminimising broom wearminimising impact on other finished work and/or work in progressamount of excessive materialsurface typeminimise environmental damagea minimum of 2000m2 are to be swept on each of three (3) projects, including primer-seal or priming, to job specificationsa minimum of 2000m2 are to be swept on each of three (3) projects, including asphalt or sealed or slurry, to job specificationsa minimum of 2000m2 are to be swept on each of three (3) projects removing loose aggregate from newly completed primer-seal or seal, to job specifications
Knowledge Evidence