Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies relevant legislation, documentation, policies and proceduresimplements the procedures and techniques for the safe, effective and efficient supervision of the manufacture of slurry surfacing including:interpreting project contract and specification requirements and proceduresinterpreting project site soil and geological dataidentifying soil and rock typesinterpreting meteorological datainterpreting material properties and test results, including compaction test results interpreting project engineeringring survey informationinterpreting project plans and drawingsinterpreting project specificationsworks effectively with others to plan, prepare and conduct the manufacture of slurry surfacing including:communicating clear and timely instructions to those involvedpreparing for and conducting briefings, toolbox and site meetingsmaintaining clear and legible written records and the reportsdemonstrates completion of the principles for the manufacture of slurry surfacing that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:preparation of job plan, which includes at least five (5) of the following;human resource requirementsplant and machinery requirementsconstruction materials requirementssub-contractor support requirementswaste disposal requirementscoordination requirementsactivity schedulingmaterials delivery schedulingrisk assessment and management requirementswork health and safety requirementsquality management requirements, including testing scheduling requirementstraffic management requirementsenvironmental requirementstask monitoring requirementstask performance monitoring requirementscommunication requirementsreporting requirementsassessment of resource requirements including at least two (2) of the following;labourplant, equipment and toolsmaterial supply vehiclesconstruction materialssub-contractor services
Knowledge Evidence