Elements and Performance Criteria
- Plan and prepare
- Access, interpret and apply compliance documentation relevant to the work activity
- Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- Identify, obtain and implement signage requirements from the project traffic management plan
- Select plant, tools and equipment to carry out levelling tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- Check levelling equipment for serviceability within specified tolerances, and report any faults
- Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
- Establish offsets for civil works
- Establish offset and recovery pegs from survey controls to specified plans and drawings to meet project requirements
- Re-establish earthwork and pavement control lines from offsets and/or recovery pegs in accordance with plans, drawings and specifications
- Establish drainage offsets from survey control
- Set up and use levelling device
- Identify heights to be transferred/established from project plans or instructions
- Set up and use levelling instruments correctly in accordance with standard operating procedures and manufacturer's guidelines
- Transfer heights from the known to the required
- Document results of levelling procedure and close them out to organisational requirements
- Clean up