Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to conduct in-situ pilings operations
  2. Locate and prepare pile positions
  3. Place concrete
  4. Remove boring rig
  5. Clean up
  6. Plan and prepare to conduct in-situ pilings operations
  7. Locate and prepare pile positions
  8. Place concrete
  9. Remove boring rig

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete cast in-situ pilings operations that meets all required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication technique and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of cast in-situ piling operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

establishing locations for piles

positioning and checking plant and related equipment

boring a hole to install a minimum of one (1) caisson, including reinforcement construction and placing concrete to that caisson

setting up, relocating and removing boring rig


Knowledge Evidence

The candidate must demonstrate knowledge of conducting cast in-situ pilings operations through:

applying legislative, organisation and site requirements and procedures for:

site equipment and safety requirements

foundation work

construction principles

water erosion

project quality requirements

civil construction terminology

selecting and using relevant tools and equipment safely

identifying and reporting hazards related to the worksite and work activity

describing bored cast in-situ piles and their installation techniques

describing scaffolding and work platform installation

interpreting engineering drawings

identifying soil, sand, rock, clay, shale, gravel and silt types and characteristics

applying processes for installing piles in water

identifying equipment types, characteristics, technical capabilities and limitations

applying and monitoring operational, maintenance and basic diagnostic procedures

applying site isolation and traffic control responsibilities and authorities

interpreting and complying with safety data sheets and materials handling methods

preparing and/or implementing JSA/JSEA/safe work method statements