Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to assist with pile driving operations
  2. Assisting with locating pile position and establishing the piling rig
  3. Support the piling process
  4. Carryout post-operational requirements
  5. Plan and prepare to assist with pile driving operations
  6. Assisting with locating pile position and establishing the piling rig
  7. Support the piling process
  8. Carryout post-operational requirements

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to direct, undertake and complete pile driving operations tasks that meet all the required outcomes including:

communicating clearly and concisely with others to resolve coordination requirements and receive and clarify work instructions

using a range of communication technique and systems such as signage to advise others of work activity and exclusion zones

demonstrates completion of directing pile driving operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

establishing recovery pegs

identifying and protecting area for pile driving

providing guidance for lifting, manoeuvring and setting up of piling rigs

installing a minimum of two (2) timber piles or two pre-cast concrete piles

demonstrating at least one (1) of the three (3) pile hammering methods


Knowledge Evidence

he candidate must demonstrate knowledge directing pile driving operations through:

applying organisation, site requirements and procedures for:

risk assessment and management

statutory compliance

work health and safety

emergency procedures

environmental protection

off-set pegging

pile locating

plumbing and pile driving

pile splicing and joining

maintenance requirements

environmentally sensitive fluids and materials disposal

chemical and fuel safety

hazardous goods handling

isolation and traffic control responsibilities and authorities

water erosion issues

civil construction terminology

foundation work

project quality requirements

work platform installation

machine operation

interpreting engineering drawings

monitoring site personal protective equipment requirements

implementing site and equipment health and safety procedures

monitoring and responding to site environmental and heritage requirements and constraints

interpreting and complying with safety data sheets and materials handling methods

preparing and/or implementing safe work method statement and/or Job safety analysis

identifying types and characteristics of soil, sand, rock, clay, shale, gravel and silt and water table

describing machine characteristics, technical capability and limitations

describing driven piles and their installation techniques

describing techniques for installing piles in water

requirements and procedures

implementing and monitoring operational, maintenance and basic diagnostic procedures

implementing isolation procedures