Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable legislation, documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of installation of sewer pipelines including:applying problem solving and troubleshooting techniquesapplying diagnostic techniquesworks effectively with others to undertake and complete the installation of sewer pipelines that meets all of the required outcomes including:communicating clearly and concisely with others to confirm work/plans/specificationsusing a range of communications techniques and equipment to convey information to othersdemonstrates completion of installing sewer pipelines that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:determining location, alignment direction, level and grade of sewer pipeline installing sewer pipeline beddinginstalling a minimum of 100 metres of sewer pipe constructing manholes, inspection and valve chambers, minor structures and thrust blocks completing pipe joins performing test procedures, establishing functionality and serviceability maintaining written and verbal reporting requirements and procedures
Knowledge Evidence