Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for installing pre-cast gully pits
  2. Install gully pits
  3. Clean up
  4. Plan and prepare for installing pre-cast gully pits
  5. Install gully pits

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installation of pre-cast gully pits including:

applying problem solving and troubleshooting techniques

applying diagnostic techniques

works effectively with others to undertake and complete the installation of pre-cast gully pits that meets all of the required outcomes including:

communicating clearly and concisely with others to confirm work/plans/specifications

using a range of communications techniques and equipment to convey information to others

demonstrates completion of installing pre-cast gully pits that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

determining location and positioning of gully pits

installing gully pits for stormwater systems

maintaining written and verbal reporting requirements and procedures


Knowledge Evidence

The candidate must demonstrate knowledge in installing pre-cast gully pits through:

accessing, interpreting and applying the legislative, organisation and site requirements and procedures for;

hazard identification, risk assessment and response

using JSA/JSEA/safe work method statements

project quality measures

using tools/equipment

maintaining excavation/trench safety

confined space entry

site dewatering

using safety data sheets and materials handling methods

using civil construction terminology

using gully pit systems and installation procedures

identifying mains pipe and utility services

using concrete and concrete fabrication

using sedimentation and erosion controls

working with storm-water systems

reading and interpreting engineering drawings

identifying equipment types, characteristics, technical capabilities and limitations

identifying site isolation and traffic control responsibilities and authorities