Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable, documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of installing signs including:identifying and applying relevant drawings and job specificationsidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements and availability of signs selecting and checking for faults, tools and equipment to carry out tasks surveying location of the site in accordance with job drawings and specificationsarranging site access in accordance with safe working procedurespreparing delivery site for risk controldetermining availability of loading/unloading equipment arranging transportation of signage protecting signs appropriately and pack them securely for transportationloading, transporting and off-loading signs and equipment correctlyworks effectively with others to undertake and complete the installation of signs in a way that meets all required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of installing signs that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:laying out and checking sign components prior to assemblyconfirming correct signage against specificationsassembling sign on or off site as appropriatedetermining method of erection according to job requirementspreparing support materials according to drawings and specificationsinstalling fastenings to manufacturer’s recommendationsbracing support structure safely erecting sign efficiently and safelyclearing work area and recycling or disposing of materials cleaning, checking, maintaining and storing plant and equipmentthe loading, transportation, unloading and installation of a minimum of three different free standing signs with at least one (1) being a free standing sign requiring the installation of dual supports
Knowledge Evidence