Elements and Performance Criteria
- Plan and prepare
- Access, interpret and apply compliance documentation relevant to the work activity
- Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- Identify, obtain and implement signage requirements from the project traffic management plan
- Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- Identify, confirm and apply environmental protection requirements from the project environmental management plan
- Set out excavation
- Install bedding materials
- Lay pipe
- Select, check and attach lifting apparatus to the pipe in preparation for lifting and installation for pipe joining
- Prepare and specify pipe ends
- Align pipe ends and push home
- Check pipe for line and level
- Advise plant operator of backfilling requirements and backfill and compact pipe to required finish level
- Finish inlets and outlets in accordance with pipe/culvert design specifications
- Clean up