Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of road construction paver screeding operations including:accessing, interpreting and applying documentation relevant to construction paver screeding operations identifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage and barriers requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issuessurveying work site for ease of access and movement works effectively with others to undertake and complete the conduct of road construction paver screeding operations that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of conducting road construction paver screeding operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:setting up paver screed for correct operationoperating paver screed for completion of work to specificationsclearing work area and disposing of, recycling or storing materials conduct road construction screed paving operations on a minimum of two (2) different material types/surface types and include the mandatory tasks of:three (3) longitudinal joints (of at least one hundred (100) m) constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructionssix (6) transverse joints constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructionsFive (5) sections of straight paving (one (1) of at least one hundred (100) linear metres) to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions, andThree (3) intersections to required thickness, uniformity, line and level, on both the matching and unsupported edge in accordance with project specifications and/or work instructionsOne (1) of the above tasks to include at least one (1) mode of automatic screed levelling devices
Knowledge Evidence