Elements and Performance Criteria
- Plan and prepare
- Access, interpret and apply compliance documentation relevant to the work activity
- Identify and apply relevant drawings and job specifications to all work activities
- Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- Identify, obtain and implement signage requirements from the project traffic management plan
- Determine material to be laid and handling procedures to be employed
- Select plant, tools and equipment to carry out tasks that are consistent with the requirements of the job, check them for serviceability, and rectify or report any faults
- Environmental protection requirements are identified from the project environmental management plan, confirmed and applied to the allotted task
- Conduct stabiliser pre-operational checks
- Operate stabiliser
- Identify site hazards associated with stabiliser operations and use safe operating techniques to minimise risk
- Identify and apply operating techniques for stabiliser to achieve optimum output in accordance with manufacturers' design specifications while achieving specified tolerances
- Operate stabiliser in accordance with company operating procedures
- Operate stabiliser to produce results, including mixing materials, using additives and line and length
- Relocate stabiliser
- Carry out operator maintenance
- Clean up