Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of stabiliser operations including:accessing, interpreting and applying documentation relevant to conducting stabiliser operations identifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks works effectively with others to undertake and complete stabiliser operations in a way that meets all requirements including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring movements and hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of conducting stabiliser operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:conducting stabiliser pre-operational checks and rectifying or reporting any faults operating stabiliser correctly and safelyrelocating stabiliser safelycarrying out operator maintenance and keeping recordsclearing work area and disposing of, recycling or storing materialscleaning, checking, maintaining and storing plant, tools and equipmentthe conduct of stabiliser operations performed on two (2) separate projects and to include:churning up (excavating and remixing) existing fill refilling in layers using the stabilised materialmixing materialsapplying additives achieving specified line and depthenhancing the properties of the existing pavementdecreasing permeabilityvolume change stabilising of an area to be performed utilising two (2) different additive types for at least five-hundred square metres (500m2) ensuring moisture content, additive application rate, pulverising, mixing, line and length are in accordance with project specifications
Knowledge Evidence