Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the of requirements, procedures and techniques for the safe, effective and efficient completion of concrete road paver operations including:accessing, interpreting and applying documentation relevant to conducting concrete road paver operationsidentifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksidentifying, obtaining, confirming and implementing signage requirements selecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues works effectively with others to undertake and complete concrete road paver operations that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring movements and hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of conducting concrete road paver operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:setting up concrete road paver operating concrete road paver making adjustments to sensors and controls while pavingusing communication systems and hand signals within workplace specificationsclearing work area and disposing of, recycling or storing materialscleaning, checking, maintaining and storing plant, tools and equipmentconducting road paver operations are to be performed for a minimum of two (2) different concrete types/surface types:no – fineskerb – gutterbasesub-basetype F barriershouldercontinuous reinforced concrete pavementand are to include the following tasks:formation within recommended lateral tilt valuesmixing and spreading granular materialsspreading concrete materialsmixing and spreading stabilised materialsand cover as a minimumthree (3) longitudinal jointsof at least one hundred metres (100m)to be constructed to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructionsfive (5) occasions of straight paving (one (1) of at least one hundred (100) linear metres) to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructionsone (1) intersection to required thickness, uniformity, line and level, on both matching and unsupported edge in accordance with project specifications and/or work instructions
Knowledge Evidence