Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to use automated paving guidance systems
  2. Setup automated paving guidance system
  3. Operate automated paving guidance system (AGPS)
  4. Conduct shutdown operations
  5. Plan and prepare to use automated paving guidance systems
  6. Setup automated paving guidance system
  7. Operate automated paving guidance system (AGPS)
  8. Conduct shutdown operations

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of APGS operations including:

accessing, interpreting and applying documentation for sealing concrete pavements

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to undertake and complete APGS that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of the use of automated paving guidance systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting up automated paving guidance system as per project specifications

operating automated paving guidance system

conducting shutdown operations

cleaning, checking, maintaining and storing total stations as per worksite requirements and manufacturer’s instructions

the conduct of APGS operations are to cover as a minimum:

setup, calibrate and pave for two hundred (200) meters within required conformance

demonstrate ability to adjust paver (six (6) times):

two (2) times horizontal (one (1) positive, one (1) negative)

Two (2) times vertical (one (1) positive, one (1) negative)

Two (2) times combination of above