Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies applicable documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of APGS operations including:accessing, interpreting and applying documentation for sealing concrete pavementsidentifying and applying relevant specifications to all work activitiesidentifying, addressing and reporting potential hazards and risksselecting and checking for faults all plant, tools and equipment to carry out tasks identifying, addressing and reporting environmental issues works effectively with others to undertake and complete APGS that meets all of the required outcomes including:preparing for and organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionsusing a range of communication techniques and aids to advise others of work activity and exclusion zonesmonitoring movements and hazards and identifying and communicating changes to the work environment during the work processdemonstrates completion of the use of automated paving guidance systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:setting up automated paving guidance system as per project specificationsoperating automated paving guidance systemconducting shutdown operationscleaning, checking, maintaining and storing total stations as per worksite requirements and manufacturer’s instructionsthe conduct of APGS operations are to cover as a minimum:setup, calibrate and pave for two hundred (200) meters within required conformancedemonstrate ability to adjust paver (six (6) times):two (2) times horizontal (one (1) positive, one (1) negative)Two (2) times vertical (one (1) positive, one (1) negative)Two (2) times combination of above
Knowledge Evidence