Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to maintain timber bridges
  2. Maintain bridge
  3. Clean up
  4. Plan and prepare to maintain timber bridges

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable, documentation, policies and procedures

works effectively with others to undertake and complete the maintenance of timber bridges that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zones

maintaining written and verbal reporting requirements and procedures

demonstrates completion of the maintenance of timber bridges that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, reporting and recording hazards and risks

replacing at least one (1) length of sheeting/decking, a minimum of two (2) metres in length and all associated activities, to specifications

replacing and painting at least one (1) fence/barrier post and at least six (6) metres of railing to specification

locating defect/fault and preparing area for rectification and reporting other defects or faults identified during maintenance


Knowledge Evidence

The candidate must demonstrate knowledge of maintaining timber bridges through:

applying organisational and site requirements and procedures for:

site and equipment safety requirements

timber bridge maintenance procedures and techniques

scaffolding

preservatives and paints

timber grading

bridge foundations

bridge heritage

calculation of material requirements

quality assurance systems and standards

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

JSA/JSEA/safe work method statements