Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to line tunnel
  2. Prepare tunnel face for concrete/shotcrete
  3. Line/shotcrete tunnel face
  4. Clean up
  5. Plan and prepare to line tunnel
  6. Prepare tunnel face for concrete/shotcrete
  7. Line/shotcrete tunnel face

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of lining tunnels including:

applying equipment/manual handling techniques

selecting and using relevant tools and equipment

identifying, reporting and recording hazards and risks

interpreting engineering drawings

identifying and reporting defects

works effectively with others to undertake and complete the lining of tunnels that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of line tunnelling that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completion of drilling and installation of rock bolts, application of reinforcing mesh and shotcreting/concreting of a minimum of a five (5) lineal metre section of tunnel


Knowledge Evidence

The candidate must demonstrate knowledge in lining of tunnels through:

identifying materials used in tunnel lining

applying construction principles

identifying equipment types, characteristics, technical capabilities and limitations

complying with project quality requirements

identifying and using civil construction terminology

complying with site isolation and traffic control responsibilities and authorities

complying with safety data sheets and materials handling methods

being prepared for fire/accident/emergency