Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to muck out tunnel earthworks
  2. Bar/scale down loose material
  3. Remove spoil by hand
  4. Load spoil by machine
  5. Remove spoil
  6. Conduct housekeeping activities
  7. Plan and prepare to muck out tunnel earthworks
  8. Bar/scale down loose material
  9. Remove spoil by hand
  10. Load spoil by machine
  11. Remove spoil
  12. Conduct housekeeping activities

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of mucking out of tunnel earthworks including:

applying equipment/manual handling techniques

selecting and using relevant tools and equipment

works effectively with others to undertake and complete the mucking out of tunnel earthworks that meets all of the required outcomes including:

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of mucking out tunnel earthworks that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completion of mucking out tunnel earthworks to the required job specification including a minimum of ten (10) cubic metres by machine