Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Required Skills
Evidence Required
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
Relevant compliance documentation may include: | legislative, organisational and site requirements and proceduresmanufacturer's guidelines and specifications Australian standardscode of practiceEmployment and workplace relations legislationEqual Employment Opportunity and Disability Discrimination legislation |
Design may include: | calculations, which may include:loadssheer forcesbending momentsstressesconstruction materials and services quantitiesconstruction cost estimatesrecommended sizing of componentsrecommended materialsrecommended reinforcement sizing and locationdrawingsrisk assessment of:the existing conditionsthe application of the designmaintainability of the works health, safety and environmental requirementscontribution to ancillary documentation, which may include:design notesconstruction notessupplementary drawingsinput to the specifications |
Civil Works may include: | land clearingbulk earthworkssurface drainage workswater storage dams constructiontailings dams constructiontopsoil managementrehabilitation worksroad works preparation (including the sub grade)pavement construction, including:flexible pavements, including:natural pavement materialsmanufactured pavement materialsasphalt placementspray seal applicationstabilisationrigid pavement construction underground services constructionconstruction of civil structurestunnellingdredging |
Confirm may include: | consultation with the clientconsultation with others within the organisationobtaining further site data, including:geological datasurvey datahydrological data |
Development and implementation factors may include: | project specificationsproject site geological dataproject site hydrological dataproject site engineering survey dataexisting project drawingsrelevant Australian or other standards |
Arranging the design tasks may include: | human resource requirementsdesign hardware and softwarecoordination requirementsschedulingreview requirementscommunication and reporting requirements |