Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare to conduct field work
  2. Design, plot and lay out a grid
  3. Read and use maps
  4. Locate mining tenement marks
  5. Plan and prepare to conduct field work
  6. Design, plot and lay out a grid
  7. Read and use maps
  8. Locate mining tenement marks

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of the conduct field work including:

identifying and using surveying instruments

using field testing and measurement instruments/equipment

identifying and applying plotting techniques

demonstrates completion of conducting field work that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting surveys

designing and plotting grids

calculating scales and distances between points

completing mining tenement forms

marking out, locating and maintaining mining tenement marks