Elements and Performance Criteria
- Plan and prepare to operate personnel and materials hoists
- Access, interpret and apply load handling documentation and ensure the work activity is compliant
- Obtain, read, interpret clarify and confirm work instructions including shift changeover details, quality requirements, plans and specifications
- Select and wear personal protective equipment appropriate for work activities
- Arrange signals and communication with other workers including barricade requirements
- Identify, address and report potential hazards and environmental issues and implement control measures
- Identify materials, equipment and tools required to complete work, check for serviceability, and report faults
- Conduct equipment pre-start checks
- Prepare personnel/material hoist
- Inspect personnel cage/platform structure and SWL plate
- Assess weather conditions for safe hoist operation
- Conduct test run through full height of travel without a load, check mast and wall bolting
- Check all safety systems including braking system
- Ensure that attachment is lowered to ground safely and does not crush feet of personnel
- Check personnel’s lanyards/harnesses and anchors comply with relevant Australian standards and are securely fitted to railing/anchor points and personnel harness attachment points
- Operate personnel/material hoist
- Lift personnel cage/platform and test all equipment in a range positions, operating controls smoothly and carefully, considering working clearances and potential crushing risks to workers
- Travel personnel cage/platform as low as possible and operating in low gear and low speed, ensuring maximum stability at all times
- Remain seated at controls whenever workers are on/in attachment and in the raised position
- Communicate with personnel cage/platform using recommended signals
- Perform post-operation activities
- Empty and park attachment in designated area
- Clean, remove, inspect and store attachments and equipment correctly
- Clean and leave attachment parked on level, secure, and safe position
- Report location and state/condition of personnel cage/platform before going off shift
- Complete all required written records and documents