Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
locates and applies relevant documentation, policies and proceduresimplements the requirements, procedures and techniques for the safe, effective and efficient completion of constructing and maintaining ventilation devices including:reading, interpreting, applying and communicating technical informationidentifying, addressing and reporting environmental issues, potential hazards and risks selecting and using relevant tools and equipmentcomplying with environmental requirements and constraintsidentifying work requirementsapplying diagnostic and fault finding techniquesapplying construction techniquesmonitoring and responding to local environmental conditions (including ventilation, gas levels, spontaneous combustion and strata conditions)inspecting and maintaining devices, equipment and materialsworks effectively with others to undertake and complete constructing and maintaining ventilation devices in a way that meets all of the required outcomes including:organising work activities to meet all task requirementscommunicating clearly and concisely with others to receive and clarify work instructionscomplying with written and verbal reporting requirements and proceduresresolving coordination requirements throughout work activitiesdemonstrates completion of constructing and maintaining ventilation devices that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:applying basic construction skills to conduct remedial work to make workplace safe and to identify potential strata hazards (roof and ribs)completing operations on the following devices in an underground coal mine:stoppings OR regulators; andovercasts OR undercasts; andseals OR bulkheadsusing materials for devices under this unit including but not limited to:poles/props/ply/meshpre-fabricated steelplaster/cementitious products or brickspumping equipmenttogether with foam or other secondary materials as necessaryestablish ventilation at construction site and monitor mine atmosphere
Knowledge Evidence