Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for excavator operations
  2. Operate excavator
  3. Lift, carry and place materials
  4. Select, remove and fit attachments
  5. Prepare to relocate the excavator
  6. Carry out machine operator maintenance
  7. Conduct housekeeping activities

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of excavator operations including:

conducting prestart checks prior to commencing operations and shutdown procedures on completion of operations

driving and operating the equipment to site conditions

applying safe work practices and identifying and reporting all potential hazards, risks and environmental issues

applying problem solving and troubleshooting techniques

applying levelling techniques

selecting and using the required tools and equipment

working safely around other machines and personnel

safely parking and securing equipment

applying methods of changing machine attachments

works effectively with others to undertake and complete excavator operations that meet all of the required outcomes including:

using a range of communications techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of conducting civil construction excavator operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing operations to specification using a variety of material types and activities including:

loading, cutting/boxing

stripping/spreading

lifting and carrying materials

bulk excavation

mixing/backfilling

trench excavation

stockpiling

battering

benching

site clean up

fitting and removal of a variety of attachments selected from the following:

tilt bucket

buckets

lifting device

vibrating compaction wheel

ripper/tyne

compaction plate

compaction wheel

rock breaker

auger


Knowledge Evidence

The candidate must demonstrate knowledge of the following when conducting civil construction excavator operations:

ground conditions

isolation procedures

equipment processes, technical capability and limitations

preparartion for fire/accident/emergency

signs of operator fatigue and how it should be managed

drawings and sketches

site isolation and traffic control responsibilities and authorities

civil construction terminology

project quality requirements

basic principles of soil technology and soil compaction for civil works

basic earthworks calculations

Civil construction activity sequences of road construction, earthworks and drainage

vehicle refuelling requirements and procedures

using methods for calculating safe working loads

operational, maintenance and basic diagnostics

housekeeping activities