Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for stockpile dozer operations
  2. Operate stockpile dozer
  3. Perform stockpile operations
  4. Carry out operator maintenance
  5. Conduct housekeeping activities

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of stockpile dozer operations including:

conducting prestart checks prior to commencing operations and shutdown procedures on completion of operations

carrying out vehicle refuelling requirements and procedures

driving and operating the equipment to site conditions

applying safe work practices and identifying and reporting all potential hazards, risks and environmental issues

applying problem solving and troubleshooting techniques

selecting and using the required tools and equipment

working safely around other machines and personnel

works effectively with others to undertake and complete the stockpile dozer operations that meet all of the required outcomes including:

using a range of communications techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of operations with stockpile dozer that safely, effectively and efficiently meets all of the required outcomes including:

completing stockpile dozer operations, demonstrating at least two (2) of the following tasks:

ripping

pushing and levelling

pad preparation

drainage

dump establishment

maintenance

monitoring and responding to spontaneous combustion and contamination indicators


Knowledge Evidence

The candidate must demonstrate knowledge of the following when conducting operations with stockpile dozer:

being prepared for spontaneous combustion situation

completing equipment lowering and lifting

communicating and performing isolation procedures

identifying equipment processes, technical capability and limitations

identifying, interpreting and using geological and technical data (basic)

being prepared for fire/accident/emergency

identifying signs of operator fatigue and how it should be managed

applying loading techniques

interpreting plans, reports, maps, specifications

applying operational, maintenance and basic diagnostics

completing housekeeping activities