  1. Plan and prepare for design, develop and maintain pillar system and ground control
  2. Develop pillar system
  3. Extract pillars
  4. Plan and prepare for design, develop and maintain pillar system and ground control
  5. Develop pillar system
  6. Extract pillars

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of designing, developing and maintaining pillar systems and ground control including:

installing secondary support devices

operating communications systems

operating extraction plant and machinery

works effectively with others to undertake and complete the designing, developing and maintenance of pillar systems and ground control that meets all of the required outcomes including:

communicating clearly and concisely with others to confirm instructions

organising and prioritising work activities

demonstrates completion of designing and maintaining pillar system and ground control that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

determining the appropriate pillar type and configuration

identifying and applying the appropriate design parameters for the location

identifying and assessing the effects of adjacent mines

identifying and assessing the characteristics and properties of the location


Knowledge Evidence

The candidate must demonstrate knowledge in designing, developing and maintaining pillar systems and ground control through:

accessing, interpreting and applying legislative, organisation and site requirements and procedures for:

determining pillar configuration

assessment of mine ground conditions

pillar design and layout

dust suppression

pillar extraction

working underground

communication systems

emergency response

environmental issues

accessing, interpreting and applying information on hazards affecting pillar design and development

accessing, interpreting and applying secondary support methods and installation techniques

accessing, interpreting and applying characteristics and properties of roofs

being prepared for fire/accident/emergency