Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for reaming
  2. Complete back reaming/ reaming
  3. Maintain equipment
  4. Respond to problems

Required Skills

Required skills

Specific skills are required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes the ability to carry out the following as required to conduct reaming

apply legislative organisation and site requirements and procedures for conducting reaming

interpret reaming data and determining an appropriate course of action

operate machine

operate ancillary equipment such as communications equipment and fluid mixers

attach reamer

check threads with thread gauge and dress slightly damaged drill stem threads

lubricate threads and other components

clean equipment and check for wear and damage

disassemble clean inspect and reassemble reaming heads

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit particularly for its application in the various circumstances in which this unit may be used This includes knowledge of the following as required to conduct reaming

basic rockgeology types and their impact on HDD operations including hard rock and scree

appropriate reamers for different geology types

principles of HDD

types of drill fluid their uses and make upadjustment procedures

relevant State regulationscodes such as NSW WorkCover code of practice for excavation and similar requirements in other states

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria required skills and knowledge and the range statement of this unit and include evidence of the following

knowledge of the requirements procedures and instructions for conducting reaming

implementation of requirements procedures and techniques for the safe effective and efficient completion of reaming

working with others to undertake and complete the conduct of reaming that meets all of the required outcomes

consistent timely completion of reaming that safely effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment Where personal safety or environmental damage are limiting factors assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment Selection and use of resources for particular worksites may differ due to the site circumstances

The assessment environment should not disadvantage the participant For example language literacy and numeracy demands of assessment should not be greater than those required on the job

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity

Aboriginal people and other people from a non English speaking background may have second language issues

Where applicable physical resources should include equipment modified for people with disabilities Access must be provided to appropriate learning andor assessment support when required

Method of assessment

This unit may be assessed in a holistic way with other units of competency The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods

written andor oral assessment of the candidates required knowledge

observed documented andor first hand testimonial evidence of the candidates

implementation of appropriate requirement procedures and techniques for the safe effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidates

working with others to undertake and complete the conduct of reaming

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

use of typical personal protective equipment including:

electrically insulating boots and gloves

eye and hearing protection

equipment for confined space entry

general protective clothing

nature and scope of tasks

specifications

quality of finished works

achieved targets

operational conditions

obtaining of required permits

site layout

out of bounds areas

worksite inspection requirements

lighting conditions

plant of equipment defects

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

Hazards may include:

electrical strike

working in proximity to drilling rig

Coordination requirements may include:

other equipment operators

maintenance personnel

supervisors

site personnel

Reamer may include:

'off the shelf' or custom designed by/for the drilling company

Fluid may include:

bentonite clay

polymer

PH adjusting agents such as soda ash

Problems may include:

buried utilities in path of bore including:

electrical power lines (overhead or buried)

gas pipes

water pipes

waste pipes (including stormwater, trade waste and sewerage)

changing geological formations, particularly cobble, rock or unstable/porous formation, faults

unreliable communications with crew

problem with selection of best reamer for the job