Elements and Performance Criteria
- Plan and prepare for installation of product pipe
- Access, interpret and apply install product pipe documentation, and ensure the work activity is compliant
- Obtain, read, interpret, clarify and confirm work requirements
- Identify and address potential risks, hazards and environmental issues and implement control measures
- Select and wear personal protective equipment appropriate for work activities
- Communicate and coordinate activities with others throughout the work activity
- Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
- Install product pipe
- Select appropriate equipment to install product pipe
- Carry out pre-start and start up procedures
- Lock out machine
- Check and connect necessary equipment
- Locate product feed to prevent damage and within breakover limitations
- Install product, removing drill stem sections to procedure as required
- Monitor and interpret all gauge/dial readings
- Monitor product feed
- Take required actions to achieve satisfactory product installation
- Maintain drill log and reports as required
- Maintain equipment
- Monitor wear on drill stem, particularly threads
- Dress damaged threads or replace drill stem as required
- Check all equipment and hoses
- Clean all equipment on completion of installation, ensuring environmental controls are followed
- Rotate drill stems in stack
- Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
- Carry out shutdown and secure equipment
- Complete housekeeping activities
- Process records
- Respond to problems
- Identify possible problems in equipment or process
- Determine problems needing action
- Determine possible fault causes
- Rectify problem using appropriate solution within area of responsibility
- Follow through items initiated until final resolution has occurred
- Report problems outside area of responsibility to designated person