Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for the grouting or cementing process
  2. Perform measurement and calculations
  3. Conduct grouting or cementing of hole
  4. Respond to problems
  5. Complete equipment maintenance and housekeeping
  6. Plan and prepare for the grouting or cementing process
  7. Perform measurement and calculations
  8. Conduct grouting or cementing of hole
  9. Respond to problems
  10. Complete equipment maintenance and housekeeping

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of grouting or cementing operations in the drilling industry including:

operating mixing equipment

operating cleaning equipment

measuring tank dimensions and calculate volumes

calculating specific gravity of mixtures and hydrostatic pressures including pressure differences between annulus and inside of casing

recording casing lengths and quantities accurately

works effectively with others to undertake and complete the grouting or cementing operations that meet all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements prior to commencing and during work activities

demonstrates completion of grouting or cementing operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

managing the mixing of grout and any additives

accessing, interpreting and applying safety data sheets (SDS)

ensuring consistency and accuracy of placed grout or cement

constructing well head, hole identification and installing hole security devices where required

ensuring there is no spillage of grout, cement or additives to minimise any associated safety hazards

disposing of any excess grout or cement according to site waste management procedures


Knowledge Evidence

The candidate must demonstrate knowledge in carrying out grouting or cementing operations through:

accessing, interpreting and applying the organization and site requirements and procedures for;

work, health and safety

environmental issues

operating drill rig

housekeeping

possible effects of grout, cement or cement additives on health

team roles and objectives during the grouting or cementing operations

properties of grout, cement or cement additives

being prepared for fire/accident/emergency